Joshua's Eagle Scout project was held on Sept 4th (also our anniversary). He did a fantastic job and the project was a success. The school was constructed over the summer. They didn't have access to the building until less than a week before school was to start. They were all in a mad rush to get everything ready for school to begin. Josh's project was very helpful in getting things ready for the students' arrival. Great Job Josh!!!
A classroom before... look, no desks! |
| When the project began, there were desks, chairs, and table stacked throughout the multi-purpose room. |
After... all the classtooms had enough desks and chairs for every student. |
Sepeti working on desks. |
| Cabinets needed to be assembled. |
| Some of the desks were defective. Here, Josh is showing these young men how to take it apart and re-assemble it so that it can be used in the classroom. |
| More cabinets to be assembled. |
| Cabinet doors were a challenge to get on. |
| There were about 30 lunch room tables to be assembled. |
| More tables... Bishop Hurlbut and Grant worked on this one. |
Cameron and Morgan worked to assemble the podium. The principal was thrilled! |
Cambren starting on desk assembly. |
Anything that couldn't be assembed that day needed to be moved to one side of the room and sectioned off. |
Josh and Connor checking out all the work completed. |
All of these chairs had to be put back into their original boxes. |
Heading home at the end of a busy and productive morning! |
Bekah and Jessica hung bulletin boards and cut things out for teachers. |
Another classroom complete with desks and chairs. |
In the end... We had all the tables and desks assembled. Chairs and desks in their rooms. The room was cleared. Curriculum was even sorted for teachers. |